Headquartered in Kinshasa & Katanga Basin, Democratic Republic of Congo | Certified Ethical Mineral Sourcing

Registry: DRC-CD/RCCM/KIN-MIN-2410
logo.jpg
person
LME GRADE A CERTIFIED CONFORMITY
UNS C11000 / BS EN 1978:1998 DRC SOURCED & REFINED

Copper Cathodes (Cu) — Grade A Electrolytic 99.99%

Direct sovereign dispatch of electrowon, non-porous electrolytic copper cathodes sourced from Tier-1 deposits across the Katanga Copperbelt. Fully compliant with international London Metal Exchange standards for high-conductivity electrical and industrial fabrication.

Purity (Cu) 99.9935% Minimum Guaranteed
Bundle Mass 2.0 – 2.5 MT High-Tensile Strapping
Sheet Gauge ~12 mm 914mm × 914mm Standard
Assay Status CEEC / SGS Double Verified
Industrial scale copper cathode warehouse staging facility in DRC Katanga corridor with bundled Grade A sheets
CENTRAL DISPATCH DEPOT • LUBUMBASHI

Bonded Staging & Verification Terminal

High-volume automated weighing, multi-strap strapping, and containerization staging.

explore
Geological Origin

Katanga Copperbelt, Haut-Katanga & Lualaba

Extracted and hydrometallurgically refined across the Kolwezi & Likasi refining corridors under sovereign extraction licenses granted by the DRC Ministry of Mines.

Analytical Certificate of Analysis (COA)

Chemical Composition & Impurity Limits

Assayed via Inductively Coupled Plasma Mass Spectrometry (ICP-MS) and Optical Emission Spectrometer (OES) in compliance with BS EN 1978:1998 Cu-ETP-1 specifications.

verified CEEC VALIDATION CODE: DRC-KAT-2026-CU99
Trace Elemental Impurities Standard: Max Allowed Threshold
Element / Analyte Symbol Maximum Limit Typical Apex Batch
Copper Purity (Basis) Cu > 99.9900% 99.9942%
Iron Fe < 2.00 ppm 0.82 ppm
Sulfur S < 4.00 ppm 1.94 ppm
Lead Pb < 1.00 ppm 0.25 ppm
Oxygen O < 10.00 ppm 4.80 ppm
Arsenic As < 1.00 ppm 0.14 ppm
Nickel Ni < 1.00 ppm 0.18 ppm
Selenium Se < 0.50 ppm 0.09 ppm
Bismuth Bi < 0.50 ppm 0.05 ppm
Aggregate Impurities Total (excluding Oxygen): < 15.0 ppm Typical
view_in_ar

Physical Packaging Dimensions

  • Cathode Sheet Geometry: 914 mm × 914 mm
  • Nominal Thickness: ~12 mm (Uniform Plate)
  • Weight per Single Sheet: ~105 kg to 125 kg
  • Bundle Metric Mass: 2,000 kg – 2,500 kg net
  • Strapping Configuration: 3×2 Heavy Steel Bands
  • Securing Medium: Heavy-Duty Export Wooden Pallets
CONTAINERIZATION SPECIFICATION

Staged in standard 20ft heavy-tested ocean containers: 9 to 11 bundles per TEU payload (approx. 20.0 to 24.5 MT per container), securely dunnaged and moisture-shielded.

verified_user
Pre-Export Assaying Mandate CEEC, Alfred H. Knight, or SGS independent sampling provided per lot.
End-to-End Operational Excellence

Dedicated Services for Copper Cathodes

Apex Minier Limited coordinates the complete DRC Katanga value chain from leach-solvent extraction to bonded deep-water port transshipment.

precision_manufacturing
Extraction Tier I

SX-EW Refining Supervision

Supervision of solvent extraction and electrowinning (SX-EW) circuits across Katanga facilities. We ensure rigid electrolyte bath filtration, automated organic removal, and strictly calibrated cell currents to eliminate surface nodulation and lead-anode spalling.

Quality Result: Smooth, non-porous cathode surface free of sulfur crystal entrapping.
rv_hookup
Multi-Modal Logistics

Corridor Rail & Freight Dispatch

Consolidating bulk consignments over the SNCC rail corridor and modern truck convoys through Kasumbalesa. Multi-modal options connect directly to the Lobito Atlantic railway, or transit via southern ports (Durban, Walvis Bay) and eastern corridors (Dar es Salaam).

Transit Tracking: GPS-locked escort with real-time sealed container surveillance.
fact_check
Institutional Assurance

CEEC & SGS Pre-Shipment Audit

Independent bundle tallying, tare subtraction, and batch drill-sampling by accredited global agencies (Bureau Veritas / SGS / AHK) prior to customs clearance sealing by the DRC Centre d'Expertise, d'Evaluation et de Certification (CEEC).

Documentation: Clean bill of lading with official DRC export tax stamped release.
Active Katanga Outbound Corridors

Seamless Movement from Pit to Global Maritime Ports

Direct operational routing available via Lobito Corridor (Atlantic), Durban Port (SADC), and Dar es Salaam (East Africa).

Lobito Corridor ~8 Days Rail
Dar es Salaam ~12 Days Transit
Durban SADC ~14 Days Transit
Institutional Offtake Desk

Execute Copper Cathode Supply Allocation

Apex Minier Limited enters into bilateral term sales and spot contracts exclusively with verified sovereign entities, licensed cable fabricators, foundries, and institutional commodity trading houses.

Compliance Requirements for Contract Execution:
  • check_circle Full corporate KYC documentation & country of destination disclosure
  • check_circle OECD Due Diligence Annex II verification sign-off
  • check_circle Confirmed Irrevocable Documentary Letter of Credit (DLC / SBLC)
  • check_circle Minimum order allocation: 500 Metric Tons per delivery batch
shield
DRC Mining Code Mandate

Registered under RCCM KIN-MIN-2410 with sovereign export quotas certified via Haut-Katanga Provincial Directorate.

OFFICIAL DESK RESPONSE WITHIN 24 BUSINESS HOURS
folder_open
Standard Export Documentation Suite

Accompanying every consignment: Commercial Invoice, Packing List, Certificate of Origin (DRC), Assay Certificate (CEEC/SGS), Bill of Lading, and Export Customs Clearance Form.

View Compliance Protocol